About Me

My photo
Plastic Moulding Expert :- 1. Thinwall Injection Moulding 2. Extrusion Blow Moulding 3.PET Preform Injection Moulding 4.Single stage Stretch Blow Moulding (ISBM) 5. Injection Blow Moulding (IBM) 6.Expanded Polystyrene (EPS) 7. Multiwall Polycarbonate Sheet Line 8. Solid Polycarbonate Sheet Line

Friday, October 7, 2011

Assembly and Disassembly Mold



The following is a good checklist for dis-assembly and assembly of a plastic injection mold.

the picture at the top show disassembly various parts of mold
Disassembly:
• The mold must be placed on two rails on a clean table with sufficient space. Tools used must be in good condition and should include allen wrenches, aluminum prybars, rubber mallet, duct tape, and some containers.
• Separate mold at parting line carefully and look for any visible damage. If mold is damaged, report it at once. Check for rust in core and cavity and report it at once if found.
• Have containers to put all the parts in and identify it with the proper job number.
• Check for core pins in Ejector Housing (at the bottom clamp plate) and remove the core pins first.
• Remove all necessary screws in the Ejector Housing and remove it.
• Remove screws from the Ejector Plate and remove it.
• Check if all pins are marked, if not mark as necessary.
• Check if lift cores are marked, if not mark as necessary.
• Remove all pins and parts from Ejector Housing. Protect all fragile parts and critical areas with duct tape.
• Remove all water line jiffy-plugs
• Remove all slides assemblies and protect all critical areas with tape or carefully store in container.
• Remove the Sprue bushing, hot sprue, or any hot runner system.
• Remove all screws from cavity and core inserts and install two or four longer screws in cavity and core. Then knock out cavity and core inserts from mold base by hitting screws with a rubber, aluminum, or copper mallet. BE CAREFUL NOT to knock insert out onto the bench or floor and damage it. If you can't bump the insert out into your own hand GET HELP.
• Once the primary inserts are removed, remove all sub-inserts, gate inserts, core pins, etc. and protect all critical edges with tape or carefully store in container.
• Carefully clean all details with a clean, mild solvent and clean towels being careful NOT to damage sharp edges, parting surfaces, shutoffs, or the cavity finish.
• Finally, store all inserts in such a way that the molding surfaces are protected and cannot be accidentally damaged.


Assembly:

• Have all the mold plates, inserts, and components in one place ready for assembly. Have a clean table and two rails to slide plates on. Tools used must be in good condition and should include allen wrenches, aluminum prybars, rubber/copper/aluminum mallets.
• Cleanliness is critical in mold assembly. Make sure all plates, inserts, and components are clean and free from grit, debris, and chips. After you have carefully cleaned all details with a clean, mild solvent and clean towels THEN wipe everything again with your clean, bare hand to remove small grit (Careful NOT to damage sharp edges, parting surfaces, shutoffs, or the cavity finish)
• Install all sub-inserts, gate inserts, core pins, etc. into the primary inserts. Check that all inserts and pins are marked and that they are installed in the correct location and position.
• Mount the B-Plate to the Support Plate
• Install the B-Half insert set, any slide assemblies, and any other B-plate components. Check that all parts are marked and that they are installed in the correct location and position.
• Insert and grease all ejector pins, ejector sleeves, and ejector blades through the pin retainer plate, support plate, and core inserts. Install all return pins and springs. Install and grease any Lifter mechanisms. Bolt on the Ejector plate.
• Assemble the ejector housing, with support pillars, guided ejection pins, etc. Guide this assembly through the ejector & other plates and bolt it to the support plate. Insert any core pins that mount in the bottom clamp plate and fasten their backup plates. Lubricate the entire assembly.
• Verify that the Slide assembly moves freely, is greased, and that the slide retainer is functioning properly.
• Move the Ejector assembly forward and check if all pins, sleeves, lift cores and all other moving components spin freely. Wiggle to verify correct clearance and that all components move freely
• Check that ejector plate can use the full length of travel. Check if runner & part will clear the core when ejected.
• Mount the A-Plate to the top clamp plate
• Install A-Half insert set, heel blocks, angle pins, and any other A-plate components. Check that all parts are marked and that they are installed in the correct location and position.
• Install the locating ring & sprue bushing, check that sprue radius, and oriface are the correct size and verify that the sprue bushing is rotation locked and retained
• If the mold features 3-plate or hot runner system install them at this stage.
• For Three-Plate molds, verify that all latches function properly, that they latch and release in assembly, and that plate separation is sufficient to let both the part AND the runner drop through. Also check that all latch dowel pins are secured so as not to come loose during operation. Lubricate the whole assembly and verify that it moves freely.
• For Hot Runner molds check that all wiring is in a channel, free from damage, and free from possible "pinches" during assembly. Check continuity all all circuits
• Install all jiffy-connectors with teflon tape or suitable thread sealant and water test.
• Check all limit switches
• Spray with WD-40 and close the assembly
• Verify that the mold has a mold strap and that it is fastened correctly

Opening Construction of 3 Plate Mold Type


There is Three plate mold construction as shown below :

basically there are three opening type in 3 plate molds base
1. Sprue Cut Opening
2. Runner Opening
3. Product Opening

below i try to explain in simple words
1. sprue cut opening
this opening will cut sprue from nozzle, so the feeding runner can take easily by arm robot or manually by hand, this opening use puller bolt and runner stripper plate to cut the sprue. the stripper plate will move after puller bolts pulled by cavity plate, remember that puller bolts also end mounted in cavity plate.
the opening length between 5mm until 10mm.

2. runner opening
this opening use tho open runner system, than runner will take by robot or manually,this opening will make space between stripper plate and cavity plate.
to make sure this runner opening safely, attach spring in puller bolts between stripper plate and cavity plate, or use other methods like attach spring in out of puller bolts. length of this opening is same with runner length + 20 mm.

3. product opening
, as we know this opening is to open the product, make space so the product can be ejected from core.
this opening length is about length the product + length robot arm + 10 until 20 mm to make save space when product ejected.

Opening Sequence

actually to pull the cavity plate, so the cavity plate can pull the puller bolts than open the stripper plate have two types, using tension link and magnet.
OK, at this post let's learn when using tension link.

1. first Opening is Runner Opening
why ? becouse between stripper plate and cavity plate,some springs always attached at there, some mold designer attach at puller bolts, and the other attach in each side using pin and make some hole to attach the spring. but i prefer attach the spring in puller bolts, it more easy in process.(sorry at picture above i don't write some spring)

2. Second Opening is Product Opening
Parting Line between core - cavity plate always easy to open, when moving plate at the injection machine pull the bottom plate until core plate, it will make Product Opening open.

3. Sprue Cutting Opening
after moving plate pull the core plate, with tension link core plate will pull the cavity plate until cavity plate pull the puller bolt, and make some space to cut the sprue from nozzle.